Malaysia · Transmission lines
Ayer Hitam–Yong Peng 275 kV double-circuit line, 40 km
Project facts
- Client
- Tenaga Nasional Berhad (TNB)
- Country
- Malaysia
- Region
- Johor
- Completed
- 1998
- Voltage
- 275 kV
- Length
- 40 km
- Sector
- Transmission lines
Scope
Erection and stringing of the double-circuit 275 kV transmission line from Ayer Hitam to Yong Peng (40 km).