Malaysia · Transmission lines

Ayer Hitam–Yong Peng 275 kV double-circuit line, 40 km

Project facts

Client
Tenaga Nasional Berhad (TNB)
Country
Malaysia
Region
Johor
Completed
1998
Voltage
275 kV
Length
40 km
Sector
Transmission lines
Scope

Erection and stringing of the double-circuit 275 kV transmission line from Ayer Hitam to Yong Peng (40 km).