Malaysia · Transmission lines
Ayer Tawar–Junjung 500 kV double-circuit line, 80 km
Project facts
- Client
- Tenaga Nasional Berhad (TNB)
- Country
- Malaysia
- Region
- Perak and Penang
- Completed
- 1998
- Voltage
- 500 kV
- Length
- 80 km
- Sector
- Transmission lines
Scope
Erection and stringing of the double-circuit 500 kV transmission line from Ayer Tawar to Junjung (80 km).