Malaysia · Transmission lines

Ayer Tawar–Junjung 500 kV double-circuit line, 80 km

Project facts

Client
Tenaga Nasional Berhad (TNB)
Country
Malaysia
Region
Perak and Penang
Completed
1998
Voltage
500 kV
Length
80 km
Sector
Transmission lines
Scope

Erection and stringing of the double-circuit 500 kV transmission line from Ayer Tawar to Junjung (80 km).