Malaysia · Transmission lines
Junjung–Gurun 500 kV double-circuit line, 20 km
Project facts
- Client
- Tenaga Nasional Berhad (TNB)
- Country
- Malaysia
- Region
- Penang and Kedah
- Completed
- 1998
- Voltage
- 500 kV
- Length
- 20 km
- Sector
- Transmission lines
Scope
Erection and stringing of the double-circuit 500 kV transmission line from Junjung to Gurun (20 km).